WASTE TREATMENT PLANT AND LANDFILL OF HERAKLION

Published : July 29th, 2022

THALIS E.S S.A. on 21/07/2022 signed a contract for the project " WASTE TREATMENT PLANT AND LANDFILL OF HERAKLION ". The project concerns the upgrading of the existing waste treatment unit in "Mavros Spilios" area of Alikarnassos utilizing all the existing facilities and infrastructure, with the aim of:

a) the extensive recovery of recyclable materials

b) the reduction of the residue sent to the landfill

c) the production of waste fuel with certified characteristics that can be used in energy-intensive industries.

 

https://www.youtube.com/watch?v=fDWZubOi6Tg

https://www.cretalive.gr/kriti/ypografike-i-symbasi-kataskeyis-mea-irakleioy