
THALIS has signed a contract with the Solid Waste Management Authority of South Aegean S.A. for the project "Restoration works at the Kos landfill due to emergency caused by fire."
Published : March 27th, 2025
The contract covers the restoration of the geosynthetic materials of Cell B, which were damaged by the fire.
The works include the exposure, removal, disposal of the damaged materials, and the supply, installation, and welding of new geosynthetics.
At THALIS, we are consistently present every day, addressing every need and challenge, delivering specialized solutions that respect the environment and effectively tackle the challenges of our time.