WASTE TREATMENT PLANT AND RESIDUE LANDFILL OF SITEIA
SOLID WASTE // PROJECT // MBT
AWARD AUTHORITY
ESDAK
CONTRACTOR
THALIS E.S. S.A.
REGEON
Region of Crete
PROGRESS
The scope of the project is the construction of a plant for the processing of mixed municipal waste, with a capacity of 15.000 tn/year. In addition, 300tn of sludge will enter the unit. The facility will be designed so that in the future it could process 8.600tn of pre-selected recyclables. It is a project that will serve 45,000 residents of the municipalities of Sitia and Ierapetra.
The object of the project includes:
- Construction of Reception Unit and Mechanical Processing
- Construction of a biological treatment plant
- Construction of Maturation - refining unit of the solid residue of the biological treatment
- Construction of Residue Landfill
- Construction of wastewater management projects and upgrading of the Drainage Treatment Plant
- Construction of rainwater management projects.
- Construction of internal road projects
- Construction of necessary infrastructure projects
- Construction of environmental monitoring projects of the facilities
- Supply of mobile equipment for operation.
- Test operation of the facilities lasting 6 months.
- Normal operation of the facilities for 5 years