SOLID WASTE TREATMENT PLANT OF HERAKLION
SOLID WASTE // PROJECT // MBT
AWARD AUTHORITY
ESDAK
CONTRACTOR
THALIS E.S. S.A.
REGEON
Region of Crete
PROGRESS
The project concerns the upgrading of the existing waste treatmen plant (WTP) in the "Mavros Spilios" area of D.E. Alikarnassos utilizing all existing facilities and infrastructure.
The Unit will have a nominal annual capacity of 59,200 t/year of municipal solid mixed waste.
The project aims to:
- the extensive recovery of recyclable materials
- the reduction of the residue sent to the landfill
- the production of waste fuel with certified characteristics that can be used in energy-intensive industries
In addition, the scope of the project includes the construction of the new cell of the Landfill in FODELE of Heraklion and specifically the following:
- New cell with a net capacity of 326,900 m3
- Leachate and biogas collection projects
- New Leachate Treatment unit construction projects.
The second part of the contract includes the normal operation of the infrastructure (MEA and XYTY) for six (6) years.