WASTEWATER TREATMENT PLANT FOR PAPASTRATOS COMPANY TOBACCO FACTORY IN ASPROPYRGOS
AWARD AUTHORITY
PHILIP MORRIS INTERNATIONAL INC.
CONTRACTOR
THALIS E.S. S.A.
REGEON
Attica
PROGRESS

The scope of the project is the construction of a compact industrial wastewater treatment plant at the PAPASTRATOS Tobacco Factory in Aspropyrgos, Attica.

The unit has a capacity of 600 m3 / day with the possibility of expansion to 900m3 / day. After the treatment, the effluent quality is suitable for irrigation uses.

The works consists of:
- Project implementation study
- Construction of civil engineering works
- Supply and installation of all equipment
- Configuration of the surrounding area
- Six months trial operation and staff training
The compact WTP includes:
- Mechanical primary treatment
- Physico-chemical primary treatment
- 1st stage of biological treatment (MBBR technology)
- Sludge separation with DAF
- 2nd stage of biological treatment (membrane bioreactor technology MBR)