SEWAGE COLLECTING SYSTEMS OF KYMINA -MALGARA IN MUNICIPALITY OF DELTA

AWARD AUTHORITY

D.E.Y.A. OF DELTA MUNICIPALITY

CONTRACTOR

JV ΙTHAKI A.TE. -. ENVIRONMENTAL ENGINEERING SA

REGEON

Central Macedonia

PROGRESS

100%

Scope of the project is the construction of the vacuum sewer system, vacuum wells with the necessary E / M equipment, suction pumping and discharge pipe to the WWTP which serves two districts of Kymina and Malgara

The project includes private long connections, approximately 5,120 m from pipelines diameter 160, which are constructed parallel with the construction of the main project.

  • The main interceptor pipes gather by suction the wastewater from homes, restaurants, shops, etc. with the help of secondary and tertiary pipes.
  • The total supply of settlements divided almost equivalent to the conductors, which makes the network operating in case of potential damage.
  • The waste water of Malgara are driven at the vacuum pumping station of Malgara, while the wastewater from  Kymina are initially led at the vacuum pumping station of Kymina and then through discharge pipe at the vacuum pumping station of Malgara.
  • From the pumping station of Malgara all sewage continue through discharge pipe with a final destination in WWTP.