EXPANSION OF HERAKLION WASTE WATER PLANT FOR THE TREATMENT OF THE WASTEWATER OF GAZI SETTLEMENT
AWARD AUTHORITY
DEYA HERAKLION
CONTRACTOR
JV MYVA S.A - AAGHS S.A
REGEON
Region of Crete
PROGRESS

The project involves the expansion and upgrading of the Wastewater Treatment Plant of the Municipality of Heraklion. The existing WWTP operates since 1996 and treats sewage total flow 30.000 m3 / d. With the offered projects the Wastewater Treatment Plant may accept other additional 6.000 m3 / d sewage, a total of 36.000 m3 / d and thus can serve 194,000 equivalent inhabitants.

The processing of additional 6.000 m3 / d serving 30,000 people equivalent is in the process of biological reactors MBR membranes, to achieve effluent suitable for irrigation.

The subject of the contract work summarizes as follows:
- Implementation study of the project.
- Building a new plant that constitutes an extension of the existing Wastewater Treatment Plant
- Trial operation of the new plant of WWTP and position in good working order
- Procurement and Construction:
- Pumping Station Entrance
- Building Detailed sieving - Flow Measurement
- Anoxic and Biological tanks
- Biological treatment with membrane technology system MBR
- Blowers building
- Dehydration building
- Leachate Pumping Station
- Deodorizing unit
- Chlorination unit
- Settlement and runoff works of stormwater
- Internal road construction works
- Building works and landscaping
- Electromechanical projects and other infrastructure projects
- Six-month trial operation and staff training of infrastructure operator