PROGRESS

100%

The project involves the expansion and upgrading of the Wastewater Treatment Plant of the Municipality of Heraklion. The existing WWTP operates since 1996 and treats sewage total flow 30.000 m3 / d. With the offered projects the Wastewater Treatment Plant may accept other additional 6.000 m3 / d sewage, a total of 36.000 m3 / d and thus can serve 194,000 equivalent inhabitants. 

The processing of additional 6.000 m3 / d serving 30,000 people equivalent is in the process of biological reactors MBR membranes, to achieve effluent suitable for irrigation.

The subject of the contract work summarizes as follows:

  • Implementation study of the project.
  • Building a new plant that constitutes an extension of the existing Wastewater Treatment Plant
    • Trial operation of the new plant of WWTP and position in good working order
    • Procurement and Construction:
    • Pumping Station Entrance
    • Building Detailed sieving - Flow Measurement
    • Anoxic and Biological tanks
    • Biological treatment with membrane technology system MBR
    • Blowers building
    • Dehydration building
    • Leachate Pumping Station
    • Deodorizing unit
    • Chlorination unit
  • Settlement and runoff works of stormwater
  • Internal road construction works
  • Building works and landscaping
  • Electromechanical projects and other infrastructure projects
  • Six-month trial operation and staff training of infrastructure operator