SUPPLY AND INSTALLATION OF EQUIPMENT FOR THE UPGRADE OF THE WASTEWATER TREATMENT PLANT OF HERAKLION
AWARD AUTHORITY
DEYA HERAKLION
CONTRACTOR
AKTOR S.A
REGEON
Region of Crete
PROGRESS

The object of the project is the supply and installation of equipment for the upgrade of the Wastewater Treatment Plant of Heraklion
The capacity of the Plant is 194.000ep
The subcontractor/constructor of the project was Thalis E.S S.A

The project includes the following tasks:
- Replacement of pre-processing gratings.
- Supply and installation of a fine sieving unit inside the metallic building.
- Supply and installation of sand and gravel system.
- Optimization of the grease removal system from the degreasing unit.
- Supply and installation of new deodorizing units.
- Supply and installation of special covers (GPR) to prevent odor emissions in various parts of the installation
- Rotating GRP covers for primary sedimentation tanks.
- Supply and installation of air curtains and fans in places of odor release.
- Upgrading of sewage receiving station.
- Supply and installation of two biogas cogenerators inside an existing building, which is modified accordingly.
- Supply and installation of desulphurisation unit.
- Supply and installation of a gas system.
- Supply and installation of a centrifuge assembly in place of a dehydration press.
- Supply and installation of soft starters (softstarters) in the existing surface aerators of the biological level.
- Replacement of signal and power wiring.
- Complete interconnection (automation, electrical, operational, etc.) of the new equipment with the existing project.
- Testing of new equipment.
- Delivery of drawings, operation manuals and maintenance of all equipment.
- Training of DEYAH staff.
- 3-year responsibility for operation and maintenance of the biogas line downstream of the digesters.