PROGRESS

100%

The project includes the design, procurement and construction of a sewage treatment plant with MBR Membranes including all required civil works as described below for the treatment of domestic sewage in 3 areas (total 7 points)

 

The capacity of the units is:

  • Oromia Condominium 1.200m3/d
  • Tulu Dimtu 1 1.980 m3/d
  • Tulu Dimtu 2 1.980 m3/d
  • Tulu Dimtu 3 1.000 m3/d
  • Bole Arabsa 1A 2.600 m3/d
  • Bole Arabsa 2A 3.600 m3/d
  • Bole Arabsa 2B 4.300 m3/d

The facilities consist of the following parts:

  • Initial lift pump station
  • Combined pretreatment system
  • Equilibration tank
  • Fine sieves
  • Primary sedimentation
  • Aeration tanks
  • MBR membranes installed in stainless tanks
  • Clarified collection tanks
  • Chemical dosing system
  • Sludge thickening tank
  • Sludge dewatering unit
  • Control centre
  • Power couple