DRAINAGE AND WASTEWATER TREATMENT PLANT AT THE SETTLEMENTS OF KOULOUKONA AND ZONIANA OF MYLOPOTAMOS MUNICIPALITY

AWARD AUTHORITY

DEYA MYLOPOTAMOS

CONTRACTOR

THALIS E.S. S.A.

REGEON

Region of Crete

PROGRESS

91%

The project concerns the construction of the necessary drainage works (transport pipelines to the sewage treatment facility) of the settlements of Dafnedes, Mourtzana, Garazon, Kalyvos, Livadia, Mariniana, Krana, Veni, Kateriana, Axos and Zoniana.

  • The implementation of the transmission pipeline network also includes 2 pumping stations and 2 pump station discharge wells.
  • The transmission pipeline network is made of Series 41 PVC. The depression network is made of polyethylene.
  • The total length of the sewers is 32,085 meters and the diameters of the pipes vary from Φ75 to Φ500.
  • A protective wall of the sewage treatment facility will also be constructed with wire boxes, on the boundary line of the Geropotamos stream with the EEL, 92 meters long and 5 meters high.