WASTEWATER TREATMENT PLANT OF AGIOS SILLAS SETTLEMENT

AWARD AUTHORITY

DEYA HERAKLION

CONTRACTOR

THALIS E.S. S.A.

REGEON

Region of Crete

PROGRESS

100%

Scope of the project is the construction of a Wastewater Treatment Plant (WWTP) via the MBBR technology

 

Specifically, two (2) parallel lines of biological treatment, each with a capacity of 500 population equivalent (PE), will be constructed. The maximum treatment capacity is 180 m3 of wastewater per day. Treated sewage will be available for surface irrigation of the area's arboriculture.