WASTEWATER TREATMENT PLANT OF AGIOS SILLAS SETTLEMENT
AWARD AUTHORITY
DEYA HERAKLION
CONTRACTOR
THALIS E.S. S.A.
REGEON
Region of Crete
PROGRESS

Scope of the project is the construction of a Wastewater Treatment Plant (WWTP) via the MBBR technology


Specifically, two (2) parallel lines of biological treatment, each with a capacity of 500 population equivalent (PE), will be constructed. The maximum treatment capacity is 180 m3 of wastewater per day. Treated sewage will be available for surface irrigation of the area's arboriculture.